Mole Construction Inc.
03FOR HOMEOWNERS

One Coordinated Process From Design Through Construction

Design & Build keeps planning, design decisions and construction under one team, so a project moves through a single organized process instead of being handed between separate designers and contractors.

Contemporary residential exterior with a concrete and wood facade, photographed at dusk.

OVERVIEW

Design & Build is for homeowners whose project needs planning and construction coordinated together from the start — typically additions, major remodels or projects where design decisions and construction scope affect each other directly.

Rather than finalizing a design and then finding a contractor to build it, Design & Build carries scope, design decisions and construction planning through one team, so tradeoffs between design and buildability are worked out early, not discovered mid-project.

WHAT THIS SERVICE CAN INCLUDE

  1. 01

    Preconstruction planning — working through scope, budget direction and constraints before design decisions are finalized.

  2. 02

    Design coordination — aligning layout and design decisions with what's actually buildable within the project's constraints.

  3. 03

    Scope and budget alignment — keeping the design direction and the project budget connected throughout planning.

  4. 04

    Permitting coordination — organizing the documentation and approvals a project needs to move forward.

  5. 05

    Construction sequencing — planning the order of work once design and scope are finalized.

  6. 06

    Single point of accountability — one team responsible for the project from planning through completion.

PROJECT TYPES

Expanded white residence with a rear addition, patio and large black-framed windows.

Home Additions

Crew framing a widened structural opening between a kitchen and living room, measuring the new header with a laser level.

Interior Reconfiguration

Double-height great room with a floating oak-and-steel staircase, second-floor catwalk and fireplace.

Major Remodeling

Crew leveling a kitchen island countertop under a vaulted, beamed ceiling that opens to the living room and garden.

Kitchen and Living Expansions

Covered outdoor living area with stone fireplace, seating and landscaped backyard.

Outdoor Living

Team reviewing floor plans, material samples and a 3D rendering on a tablet with homeowners at a table.

Preconstruction Planning

THE COORDINATED PROCESS

    01

    Consultation

    Understand the property, the goals for the project and the constraints to plan around.

    02

    Scope & Planning

    Define the project scope and budget direction before design decisions are finalized.

    03

    Design & Coordination

    Work through design decisions alongside what's buildable within the approved scope.

    04

    Construction

    Move into construction with design and scope already aligned, not still being resolved.

    05

    Completion

    Review the finished project against the original scope and hand it off.

WHY MOLE

Design decisions and construction planning happen together, so buildability is considered early rather than discovered once construction starts.

One team carries accountability for the project from the first conversation through completion.

Design & Build here means a coordinated process, not an in-house architecture or engineering department — design work is coordinated as part of that process, not stamped in-house.

The same coordinated approach applies to residential and commercial projects alike.

SERVICE AREAS

Northern Virginia

Loudoun, Fairfax, Arlington County, City of Alexandria

Washington, D.C.

District of Columbia

Maryland

Montgomery, Prince George's, Howard County

FREQUENTLY ASKED QUESTIONS

What does Design & Build actually mean at Mole?

It means planning, design decisions and construction are coordinated under one team and one process, rather than a separate designer handing off to a separate contractor.

Does Mole provide in-house architects or engineers?

No — Design & Build refers to a coordinated process. Design decisions are worked through as part of that process, not produced by an in-house architecture or engineering department.

What kinds of projects use Design & Build?

Additions, major remodels and other projects where design decisions and construction scope need to be worked out together are the best fit for this process.

How early does construction planning start?

Preconstruction planning — scope, budget direction and constraints — starts before design decisions are finalized, so the two stay connected throughout.

Is Design & Build only for residential projects?

No — the same coordinated process is available for residential and commercial projects; this page focuses on the residential side of that work.

06 · START YOUR PROJECT

Ready To Build With Clear Direction?

Tell us about your property, priorities and the type of work you are considering.

VERIFIED EXTERNAL PROFILES

Explore Mole Construction across independent business and design platforms.

01

Yelp

Independent reviews from homeowners and businesses, published directly on Yelp.

READ REVIEWS ON YELP
02

BBB Business Profile

Mole Construction's external business profile, published on BBB.org.

VIEW BBB BUSINESS PROFILE
03

Houzz

Mole Construction's profile among design and remodeling professionals on Houzz.

EXPLORE MOLE ON HOUZZ